Metro Bilbao bogies s500 Overhaul

Metro Bilbao bogies s500 Overhaul

Metro Bilbao awards to CAF the Overhaul of 218 bogies s500:

  • 192 bogies motor.
  • 26 trailer bogies.

Description of the work to be carried out:

  • Cleaning Frames
  • Disassembly of Axes + Elements
  • Axle revision/repair
  • Removal of frame elements
  • Cylinders and Bogie Pivot Review
  • Blasting Frame
  • Welding and Reinforcement verification
  • Thermal treatment
  • Dimensional control
  • Retouching of rods and E.N.D.
  • Disassembly of connecting rods, measurement and opening
  • Sleepers and Frames Painting
  • Axle Painting
  • Final assembly
  • Tests: